Skip to content
Play Online
Deepwater Rig

Deepwater Rig

A deepwater drilling complex yields far more metal from the same field at sea.

BuildingSupportTier 3Structure

Stats

Tier
Tier 3
Cost
810 metal
Build time
56 s
Hit points
1700
Armor
Structure
Vision
6 tiles
Footprint
2×2 tiles
Power
−15
Mining
+8 metal/s
Weapons
Unarmed
  • Must be placed on a metal deposit
  • Only obtained by upgrading; it cannot be placed directly.

The last step on the offshore line: three derricks and 8 metal a second from one field, the same as the Deep-Core Extractor on land, for a 500-metal, 30-second upgrade on an Advanced Offshore Rig. It draws 15 power.

How to use

One of these is worth five ordinary rigs, and it often stands in open water, where its defence depends on ships and aircraft; on ice, land vehicles can guard it too. Put it on the field your fleet already holds, keep an Aegis Frigate nearby for the aircraft that will come for it, and have the plant built before the bore.

Trivia

  • The deepwater rig retains the same two-by-two footprint as its first level. Its income, health and power draw match the Lv.3 land extractor, even though its derricks stand over water.

Last edited